英语翻译
问题描述:
英语翻译
1.船到目的地后.买方必须一天卸货一万吨.比方说,三万吨必须在3天内卸完.若超过预计时间,买方须付违约金USD10000/天.
2.信用证到后45天内出第一批货物,接下来的60天内分批出完剩余货物.
3.具体的出货计划在收到信用证后告知买方.
答
Once the ship arrive the destination port.The buyer has to unload at least 10,000T per day.(ie.You have to unload all the goods within 3 days if there is 30,000T goods).If the unloading time has been ...