英语翻译随着电力事业的迅速发展,超临界机组已成为新建机组的主流,旁路控制在机组稳定运行、节能减排过程中扮演越来越重要的角色.本文主要介绍了淮浙煤电凤台电厂2×600MW超临界机组的经典旁路控制,并且对调试过程中发生的问题和处理进行了简单的介绍.
英语翻译
随着电力事业的迅速发展,超临界机组已成为新建机组的主流,旁路控制在机组稳定运行、节能减排过程中扮演越来越重要的角色.本文主要介绍了淮浙煤电凤台电厂2×600MW超临界机组的经典旁路控制,并且对调试过程中发生的问题和处理进行了简单的介绍.
With the power of the cause of the rapid development of supercritical generating units have become the mainstream of the new unit, the bypass control unit in the stable operation of energy-saving reduction in the process of playing an increasingly important role. This article introduced the Huai Zhejiang coal power plant Fengtai 2 × 600MW supercritical unit of the classic bypass control and process debug of problems to deal with and had a brief introduction.
With the rapid development of power industry,supercritical generating units have become the mainstream of the new unit,bypass control and stable operation of the unit,energy-saving emission reduction play an increasingly important role.This paper mainly introduces Zonghuai Zhejiang coal plant Fengtai 2 × 600MW supercritical generating units classic bypass control and the process of debugging problems and deal with a brief introduction.