英语翻译
英语翻译
本项目合同金额为190204608元,是“五纵、六横、七条线”高速公路网络中“纵三”的重要组成部分.本合同段全长12.1公里(起点桩号为K0+000,止点桩号K12+100).全线有桥7座,合计长1519m,其中大桥5座,分别是周家湾大桥(单幅140×2)m、榨河大桥(单幅420×2)m、唐家楼大桥(单幅240×2)m、王家湾大桥(单幅540×2)m、唐家磅大桥(单幅160×2)m,中桥两座,分别为河西垸中桥、西张店中桥,其中唐家楼大桥和王家湾大桥为30米预应力砼连续T梁,其余均为20米预应力砼空心板;农机天桥5座;预制24m以上梁片312片.涵洞29座,通道15座,其中农机通道8座,人行通道2座,汽车通道5座;隧道两座,即周家湾隧道为连拱隧道,起点桩号K0+465,止点桩号K0+935,隧道净长470米;落依山隧道1座为分离式隧道,隧道净长1580米.
This project contract for 190204608 yuan, is the amount of "five longitudinal, six horizontal, seven line" highway network "longitudinal and three" important component. This contract section full-length 12.1 km (starting point for pile K0 +.000, no BDC K12 + 100) pile number. A bridge across the seven 1519m, among them, aggregate long bridge, respectively is 5 tombs ZhouGuWan bridge (singles 140 x 2) m, squeezed river bridge (singles 420 x 2) m, TangGuLou bridge (240 x 2) singles WangGuWan bridge (m, singles 540 x 2) m, TangGu pounds bridge (singles 160 x 2) m, two medium-sized, respectively, western medium-sized ZhangDian hexi liuheyuan TangGuLou bridge, which medium-sized WangGuWan bridge for 30 meters with prestressed concrete continuous beam, others are T 20 meters prestressed concrete hollow slab; Farm machinery overpass 5 block; Prefabrication 24m 312 chips. Above beam tablet Culvert 29 seats, the channel 15 seats, including farm machinery channel 8 saddles, pedestrian channel 2 seat, car channel 5 block; Tunnel ZhouGuWan tunnel, namely two multi-arch tunnel, starting point, K0 + 465 pile number BDC K0 + 935 pile, tunnel, net long 470 meters; Fall in mountain tunnel 1 seat for separate tunnel, tunnel net long's 15 meters.