英语翻译
英语翻译
The quantities given in the Bill of Quantities are estimated and provisional,and are given to provide a common basis for bidding.The basis of payment will be the actual quantities of work ordered and carried out,as measured by the Contractor and verified by the Engineer and valued at the rates and prices bid in the priced Bill of Quantities,where applicable,and otherwise at such rates and prices as the Engineer may fix within the terms of the Contract.The rates and prices of major materials (steel pipes,electromagnetic meters and valves) will be paid upon delivered to the site according to the related items in the Technical Specifications.
工程量清单计价了临时的估计,并给出了投标提供通用的基础.将会支付的基础上的实际数量的工作有序进行,这是通过测量方法进行了验证承包商,工程师和价值的费率和价格标价的投标,适用于清单计价,不然在这样的费率和价格...