1、In the end of the construction should be presented the final location of the pipes,in a CD including every materials and works associated.
2、Execution of all tests and experences solicited in the Contract Specification or by the Construction Supervision,including every materials and works associsted.
3、Technical Assistance during the time of guarantee if all materials and equipments,including every necessary works and accessories.

1.建设工作收尾时应标出管道的最终定位点,存单中要包括所有材料及相关机件.
2.合同细则或是在建设监理要求下的各种试验及经验的应用,包括所有材料及相关机件.
3.针对所有材料及设备,包括各种机件和配件的技术支持.