-\x05Evaluate soil report and establish foundation design
-\x05Establish foundation loads and anchor details
-\x05Establish slab design
-\x05Instrument conduit in base slab
-\x05Foundation Heating System to tank side junction boxes
-\x05Detailed drawings of slab and foundation,MTO
-\x05Establish wall design,post tension requirements,MTO
-\x05Analysis of wall,crack distribution
-\x05Seismic analysis
-\x05Establish wall strains by analysis
-\x05Concrete movements onto Steel Liner
-\x05Concrete Specs,Post tension specification,construction specification
-\x05Establish nozzle and platform plinth design
-\x05Blast and Projectile analysis if required
-\x05Roof design,analysis and details
-\x05Heat flux and thermal design
-\x05Detailed drawings,arrangements,bar schedules
-\x05Finishes to tank area
-\x05Design office support during the construction phase (UK office responses to site queries)
-\x05Attendance at Kick-off and review meetings as per project schedule

评估泥土检测报告以及确立地基设计方案确立装载以及支架细节确立平板设计基层平板的仪器导管储槽边接线盒的地热系统更细节化的平板与地基设计图,根据订单要求确立墙面设计,后张需求,根据订单要求墙面分析,裂纹分布地...