英语翻译
问题描述:
英语翻译
The evaluations include observations from excavations at highways built on both clay and sand subgrades.The geosynthetics excavated include geocomposite edge drains,geotextile-wrapped pipe edge drains and geotextile-wrapped aggregate edge drains.
答
评估项包括对在粘土和沙子路基上建造的高速公路上的基坑开挖物的检测,挖掘出的土工合成材料包括土工合成材料的边缘排水管道,土工纺织物包裹的管道边缘排水管道及其总边缘排水管道.
呵呵呵,有点吃力,希望能帮到你1