英语翻译There are some problems with the test of XXXX.When the test went to the step E.3.b of the attached test procedure,“E.3.b With the DC load drawing 5.0A,the LED [D1] should turn on(illuminated) within 10seconds”,the LED [D1] was not turned on with 10seconds but about 35seconds.The ripple/noise voltage should remain at lessthan 350mVp-p on the oscilloscope during the test of step E.4 to E.6,but the ripple/noise voltage we measured was about 400mVp-p

问题描述:

英语翻译
There are some problems with the test of XXXX.
When the test went to the step E.3.b of the attached test procedure,
“E.3.b With the DC load drawing 5.0A,the LED [D1] should turn on(illuminated) within 10seconds”,
the LED [D1] was not turned on with 10seconds but about 35seconds.
The ripple/noise voltage should remain at lessthan 350mVp-p on the oscilloscope during the test of step E.4 to E.6,
but the ripple/noise voltage we measured was about 400mVp-p which could not reach the request of test procedure.
Could you give someadvice on how to proceed?