英语翻译ExtensionAgreement on the Loan AgreementLender:(the “Lender”)Address:38 Eunhaeng-ro(16-1 Yeouido-dong),Yeongdeungpo-gu,Seoul,KoreaBorrower :(the “Borrower”)Address :Due to its production,operation and investment activities,the Borrowerfaces difficulties in repaying the matured loan (U$7,000,000.-) under the Loan Agreementdated 10th of Dec,2012 (the “Facility”) entered into between the Lenderand the Borrower.Therefore,the Borrower requests Lender t

问题描述:

英语翻译
ExtensionAgreement on the Loan Agreement
Lender:(the “Lender”)
Address:38 Eunhaeng-ro(16-1 Yeouido-dong),Yeongdeungpo-gu,Seoul,Korea
Borrower :(the “Borrower”)
Address :
Due to its production,operation and investment activities,the Borrowerfaces difficulties in repaying the matured loan (U$7,000,000.-) under the Loan Agreementdated 10th of Dec,2012 (the “Facility”) entered into between the Lenderand the Borrower.
Therefore,the Borrower requests Lender to extend the term of the Facility.Upon examination and verification,the Lender agrees to extend the term of theFacility requested by the Borrower.After mutual consultation,the parties agree as follows:
Article1.The Facility in favor of the Borrower in the amountof Seven million U.S.Dollars (U$7,000,000.-) under the Loan Agreement shall bedue and payable on 31st of Dec,2013.The parties agree the repayment date of the aggregate principal amount of the Facility outstanding (the “ExtendedLoan”) shall be deferred to 31stof Dec,2014.
Article2.The interest on the Extended Loan for theextended term shall be the rate equal to Libor(3M) + 1.87%(One point Eight Sevenpercent).
This Extension Agreement shallcome into force from the date of execution of this Agreement by the dulyauthorized representatives of the Lender and the Borrower with their respectiveseals affixed thereto and shall be automatically terminated upon the fullrepayment of the principal of the Extended Loan and its interest accruedthereto and all sums payable by the Borrower.

ExtensionAgreement贷款协议银行:(“银行”)地址:38 Eunhaeng-ro(结果Yeouido-dong)Yeongdeungpo-gu,首尔,韩国借款人:(以下简称“借款人”)地址:由于其生产、经营和投资活动的Borrowerfaces偿还到期贷款的困难(U 7000000美元。)在贷款Agreementdated 12月10日,2012年(“设备”)进入Lenderand借款人之间。因此,借款人请求银行延长任期的设施。审核后,贷款人同意延长期限theFacility要求借款人。共同协商后,双方同意如下:四。设备支持借款人的还贷的七百万美元(U - 7000000美元)贷款协议下应付bedue和12月31日,2013年。双方同意的总本金的还款日期安排优秀(“ExtendedLoan”)应当延期stof 12月31日,2014年。第二条。长远来看延长贷款的利息应等于Libor率(3米)+ 1.87%(一点八Sevenpercent)。shallcome这个扩展协议生效之日起本协议的执行dulyauthorized代表银行和借款人respectiveseals其和应自动终止的fullrepayment延长贷款的本金及其利息accruedthereto由借款人和所有应付款项。

在贷款协议extensionagreement
贷款人:(“银行”)
地址:38 eunhaeng RO(16-1汝矣岛洞),永登浦,汉城,韩国
借款人:(“借款人”)
称呼和地址

由于其生产,经营和投资活动,在偿还贷款的成熟borrowerfaces困难(美金7000000。-)下的贷款agreementdated第十月,2012(“设备”)进入lenderand借款人之间。
因此,借款人申请贷款的期限延长设施。经审查核实,贷款人同意延长该期限由借款人的要求。经双方协商,双方同意如下:
第一条。在金七百万美元借款人的设备支持(美金7000000。-)在贷款协议应在12月应付因为第三十一,2013。双方同意的设施,优秀的总本金还款日(“extendedloan”)应推迟到12月31stof,2014。
第二条。在扩展项扩展的贷款利息应率等于伦敦银行同业拆息(3M)+ 1.87%(一点八sevenpercent)。
这个扩展协议shallcome实施本协定的执行日期的dulyauthorized代表银行和他们的respectiveseals粘贴,将自动终止对扩展的贷款和利息accruedthereto和所有主要的fullrepayment款项由借款人支付借款。

贷款延期协议贷款人:XXX地址:韩国首尔市永登浦区银行路38(汝矣岛洞16-1) (我查了一下,这个是韩国进出口银行的地址,标准的中文翻译就是这个)借款人 :XXX地址:XXX因为生产、运营和投资不善,借款人难以偿还与贷款...