英语翻译摘 要 本文主要对杭州铁路东站枢纽彭埠单元R21-26地块农转居公寓建设项目的环境影响评价的编制进行全面阐述,总结归纳了房地产建设开发在建设期和营运期的环境保护工作的重点与措施,并且通过我国环境影响评价制度与国外环境影响评价制度的对比,指出我国以后环境影响评价制度应该发展的方向.关键词:房地产类建设项目 环境保护 环境影响评价 制度少翻了关键词

问题描述:

英语翻译
摘 要 本文主要对杭州铁路东站枢纽彭埠单元R21-26地块农转居公寓建设项目的环境影响评价的编制进行全面阐述,总结归纳了房地产建设开发在建设期和营运期的环境保护工作的重点与措施,并且通过我国环境影响评价制度与国外环境影响评价制度的对比,指出我国以后环境影响评价制度应该发展的方向.
关键词:房地产类建设项目 环境保护 环境影响评价 制度
少翻了关键词

This article on the Hangzhou East Railway Station Peng hub port unit R21-26 to agricultural home apartment block construction of the project's environmental impact assessment on the preparation of a comprehensive, summed up the building of real estate development in the construction period and operation period of environmental protection With the focus on measures and the adoption of China's environmental impact assessment system and foreign environmental impact assessment system in contrast, pointed out that after China's environmental impact assessment system should be developed in the direction

Abstract In this paper,the East Railway Station of Hangzhou hub port unit Peng R21-26 plots of agricultural apartment to Habitat construction projects in the preparation of environmental impact assess...