来个大神帮我翻一下 不要百度翻译It is mentioned in the clause 61 drawing supply that the engineer well supply all drawings in accordance with the necessity of the progress of the works defind in the drawing supply schedule.But what shall we do if the delay of the drawing supply really happens?

问题描述:

来个大神帮我翻一下 不要百度翻译
It is mentioned in the clause 61 drawing supply that the engineer well supply all drawings in accordance with the necessity of the progress of the works defind in the drawing supply schedule.But what shall we do if the delay of the drawing supply really happens?

图纸供应条款61条指出,在整个制图工作进度中,程技师要根据的工程进展情况需要,及时完好地提供所有相应图纸.若工程技师未能及时提供图纸,我们要做何处理?